KGantt::Legend
#include <KGanttLegend>

Public Member Functions | |
| Legend (QWidget *parent=nullptr) | |
| ~Legend () override | |
| QModelIndex | indexAt (const QPoint &point) const override | 
| QSize | minimumSizeHint () const override | 
| void | scrollTo (const QModelIndex &, ScrollHint=EnsureVisible) override | 
| void | setModel (QAbstractItemModel *model) override | 
| QSize | sizeHint () const override | 
| QRect | visualRect (const QModelIndex &index) const override | 
  Public Member Functions inherited from QAbstractItemView | |
| QAbstractItemView (QWidget *parent) | |
| void | activated (const QModelIndex &index) | 
| bool | alternatingRowColors () const const | 
| int | autoScrollMargin () const const | 
| void | clearSelection () | 
| void | clicked (const QModelIndex &index) | 
| void | closePersistentEditor (const QModelIndex &index) | 
| QModelIndex | currentIndex () const const | 
| Qt::DropAction | defaultDropAction () const const | 
| void | doubleClicked (const QModelIndex &index) | 
| DragDropMode | dragDropMode () const const | 
| bool | dragDropOverwriteMode () const const | 
| bool | dragEnabled () const const | 
| void | edit (const QModelIndex &index) | 
| EditTriggers | editTriggers () const const | 
| void | entered (const QModelIndex &index) | 
| bool | hasAutoScroll () const const | 
| ScrollMode | horizontalScrollMode () const const | 
| QSize | iconSize () const const | 
| void | iconSizeChanged (const QSize &size) | 
| QWidget * | indexWidget (const QModelIndex &index) const const | 
| virtual QVariant | inputMethodQuery (Qt::InputMethodQuery query) const const override | 
| bool | isPersistentEditorOpen (const QModelIndex &index) const const | 
| QAbstractItemDelegate * | itemDelegate () const const | 
| QAbstractItemDelegate * | itemDelegate (const QModelIndex &index) const const | 
| QAbstractItemDelegate * | itemDelegateForColumn (int column) const const | 
| virtual QAbstractItemDelegate * | itemDelegateForIndex (const QModelIndex &index) const const | 
| QAbstractItemDelegate * | itemDelegateForRow (int row) const const | 
| virtual void | keyboardSearch (const QString &search) | 
| QAbstractItemModel * | model () const const | 
| void | openPersistentEditor (const QModelIndex &index) | 
| void | pressed (const QModelIndex &index) | 
| virtual void | reset () | 
| void | resetHorizontalScrollMode () | 
| void | resetVerticalScrollMode () | 
| QModelIndex | rootIndex () const const | 
| void | scrollToBottom () | 
| void | scrollToTop () | 
| virtual void | selectAll () | 
| QAbstractItemView::SelectionBehavior | selectionBehavior () const const | 
| QAbstractItemView::SelectionMode | selectionMode () const const | 
| QItemSelectionModel * | selectionModel () const const | 
| void | setAlternatingRowColors (bool enable) | 
| void | setAutoScroll (bool enable) | 
| void | setAutoScrollMargin (int margin) | 
| void | setCurrentIndex (const QModelIndex &index) | 
| void | setDefaultDropAction (Qt::DropAction dropAction) | 
| void | setDragDropMode (DragDropMode behavior) | 
| void | setDragDropOverwriteMode (bool overwrite) | 
| void | setDragEnabled (bool enable) | 
| void | setDropIndicatorShown (bool enable) | 
| void | setEditTriggers (EditTriggers triggers) | 
| void | setHorizontalScrollMode (ScrollMode mode) | 
| void | setIconSize (const QSize &size) | 
| void | setIndexWidget (const QModelIndex &index, QWidget *widget) | 
| void | setItemDelegate (QAbstractItemDelegate *delegate) | 
| void | setItemDelegateForColumn (int column, QAbstractItemDelegate *delegate) | 
| void | setItemDelegateForRow (int row, QAbstractItemDelegate *delegate) | 
| virtual void | setRootIndex (const QModelIndex &index) | 
| void | setSelectionBehavior (QAbstractItemView::SelectionBehavior behavior) | 
| void | setSelectionMode (QAbstractItemView::SelectionMode mode) | 
| virtual void | setSelectionModel (QItemSelectionModel *selectionModel) | 
| void | setTabKeyNavigation (bool enable) | 
| void | setTextElideMode (Qt::TextElideMode mode) | 
| void | setVerticalScrollMode (ScrollMode mode) | 
| bool | showDropIndicator () const const | 
| virtual int | sizeHintForColumn (int column) const const | 
| QSize | sizeHintForIndex (const QModelIndex &index) const const | 
| virtual int | sizeHintForRow (int row) const const | 
| bool | tabKeyNavigation () const const | 
| Qt::TextElideMode | textElideMode () const const | 
| void | update (const QModelIndex &index) | 
| ScrollMode | verticalScrollMode () const const | 
| void | viewportEntered () | 
  Public Member Functions inherited from QAbstractScrollArea | |
| QAbstractScrollArea (QWidget *parent) | |
| void | addScrollBarWidget (QWidget *widget, Qt::Alignment alignment) | 
| QWidget * | cornerWidget () const const | 
| QScrollBar * | horizontalScrollBar () const const | 
| Qt::ScrollBarPolicy | horizontalScrollBarPolicy () const const | 
| QSize | maximumViewportSize () const const | 
| QWidgetList | scrollBarWidgets (Qt::Alignment alignment) | 
| void | setCornerWidget (QWidget *widget) | 
| void | setHorizontalScrollBar (QScrollBar *scrollBar) | 
| void | setHorizontalScrollBarPolicy (Qt::ScrollBarPolicy) | 
| void | setSizeAdjustPolicy (SizeAdjustPolicy policy) | 
| virtual void | setupViewport (QWidget *viewport) | 
| void | setVerticalScrollBar (QScrollBar *scrollBar) | 
| void | setVerticalScrollBarPolicy (Qt::ScrollBarPolicy) | 
| void | setViewport (QWidget *widget) | 
| SizeAdjustPolicy | sizeAdjustPolicy () const const | 
| QScrollBar * | verticalScrollBar () const const | 
| Qt::ScrollBarPolicy | verticalScrollBarPolicy () const const | 
| QWidget * | viewport () const const | 
  Public Member Functions inherited from QFrame | |
| QFrame (QWidget *parent, Qt::WindowFlags f) | |
| QRect | frameRect () const const | 
| Shadow | frameShadow () const const | 
| Shape | frameShape () const const | 
| int | frameStyle () const const | 
| int | frameWidth () const const | 
| int | lineWidth () const const | 
| int | midLineWidth () const const | 
| void | setFrameRect (const QRect &) | 
| void | setFrameShadow (Shadow) | 
| void | setFrameShape (Shape) | 
| void | setFrameStyle (int style) | 
| void | setLineWidth (int) | 
| void | setMidLineWidth (int) | 
  Public Member Functions inherited from QWidget | |
| QWidget (QWidget *parent, Qt::WindowFlags f) | |
| bool | acceptDrops () const const | 
| QString | accessibleDescription () const const | 
| QString | accessibleName () const const | 
| QList< QAction * > | actions () const const | 
| void | activateWindow () | 
| QAction * | addAction (const QIcon &icon, const QString &text) | 
| QAction * | addAction (const QIcon &icon, const QString &text, Args &&... args) | 
| QAction * | addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut) | 
| QAction * | addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut, Args &&... args) | 
| QAction * | addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut, const QObject *receiver, const char *member, Qt::ConnectionType type) | 
| QAction * | addAction (const QIcon &icon, const QString &text, const QObject *receiver, const char *member, Qt::ConnectionType type) | 
| QAction * | addAction (const QString &text) | 
| QAction * | addAction (const QString &text, Args &&... args) | 
| QAction * | addAction (const QString &text, const QKeySequence &shortcut) | 
| QAction * | addAction (const QString &text, const QKeySequence &shortcut, Args &&... args) | 
| QAction * | addAction (const QString &text, const QKeySequence &shortcut, const QObject *receiver, const char *member, Qt::ConnectionType type) | 
| QAction * | addAction (const QString &text, const QObject *receiver, const char *member, Qt::ConnectionType type) | 
| void | addAction (QAction *action) | 
| void | addActions (const QList< QAction * > &actions) | 
| void | adjustSize () | 
| bool | autoFillBackground () const const | 
| QPalette::ColorRole | backgroundRole () const const | 
| QBackingStore * | backingStore () const const | 
| QSize | baseSize () const const | 
| QWidget * | childAt (const QPoint &p) const const | 
| QWidget * | childAt (int x, int y) const const | 
| QRect | childrenRect () const const | 
| QRegion | childrenRegion () const const | 
| void | clearFocus () | 
| void | clearMask () | 
| bool | close () | 
| QMargins | contentsMargins () const const | 
| QRect | contentsRect () const const | 
| Qt::ContextMenuPolicy | contextMenuPolicy () const const | 
| QCursor | cursor () const const | 
| void | customContextMenuRequested (const QPoint &pos) | 
| WId | effectiveWinId () const const | 
| void | ensurePolished () const const | 
| Qt::FocusPolicy | focusPolicy () const const | 
| QWidget * | focusProxy () const const | 
| QWidget * | focusWidget () const const | 
| const QFont & | font () const const | 
| QFontInfo | fontInfo () const const | 
| QFontMetrics | fontMetrics () const const | 
| QPalette::ColorRole | foregroundRole () const const | 
| QRect | frameGeometry () const const | 
| QSize | frameSize () const const | 
| const QRect & | geometry () const const | 
| QPixmap | grab (const QRect &rectangle) | 
| void | grabGesture (Qt::GestureType gesture, Qt::GestureFlags flags) | 
| void | grabKeyboard () | 
| void | grabMouse () | 
| void | grabMouse (const QCursor &cursor) | 
| int | grabShortcut (const QKeySequence &key, Qt::ShortcutContext context) | 
| QGraphicsEffect * | graphicsEffect () const const | 
| QGraphicsProxyWidget * | graphicsProxyWidget () const const | 
| bool | hasEditFocus () const const | 
| bool | hasFocus () const const | 
| virtual bool | hasHeightForWidth () const const | 
| bool | hasMouseTracking () const const | 
| bool | hasTabletTracking () const const | 
| int | height () const const | 
| virtual int | heightForWidth (int w) const const | 
| void | hide () | 
| Qt::InputMethodHints | inputMethodHints () const const | 
| void | insertAction (QAction *before, QAction *action) | 
| void | insertActions (QAction *before, const QList< QAction * > &actions) | 
| bool | isActiveWindow () const const | 
| bool | isAncestorOf (const QWidget *child) const const | 
| bool | isEnabled () const const | 
| bool | isEnabledTo (const QWidget *ancestor) const const | 
| bool | isFullScreen () const const | 
| bool | isHidden () const const | 
| bool | isMaximized () const const | 
| bool | isMinimized () const const | 
| bool | isModal () const const | 
| bool | isTopLevel () const const | 
| bool | isVisible () const const | 
| bool | isVisibleTo (const QWidget *ancestor) const const | 
| bool | isWindow () const const | 
| bool | isWindowModified () const const | 
| QLayout * | layout () const const | 
| Qt::LayoutDirection | layoutDirection () const const | 
| QLocale | locale () const const | 
| void | lower () | 
| QPoint | mapFrom (const QWidget *parent, const QPoint &pos) const const | 
| QPointF | mapFrom (const QWidget *parent, const QPointF &pos) const const | 
| QPoint | mapFromGlobal (const QPoint &pos) const const | 
| QPointF | mapFromGlobal (const QPointF &pos) const const | 
| QPoint | mapFromParent (const QPoint &pos) const const | 
| QPointF | mapFromParent (const QPointF &pos) const const | 
| QPoint | mapTo (const QWidget *parent, const QPoint &pos) const const | 
| QPointF | mapTo (const QWidget *parent, const QPointF &pos) const const | 
| QPoint | mapToGlobal (const QPoint &pos) const const | 
| QPointF | mapToGlobal (const QPointF &pos) const const | 
| QPoint | mapToParent (const QPoint &pos) const const | 
| QPointF | mapToParent (const QPointF &pos) const const | 
| QRegion | mask () const const | 
| int | maximumHeight () const const | 
| QSize | maximumSize () const const | 
| int | maximumWidth () const const | 
| int | minimumHeight () const const | 
| QSize | minimumSize () const const | 
| int | minimumWidth () const const | 
| void | move (const QPoint &) | 
| void | move (int x, int y) | 
| QWidget * | nativeParentWidget () const const | 
| QWidget * | nextInFocusChain () const const | 
| QRect | normalGeometry () const const | 
| void | overrideWindowFlags (Qt::WindowFlags flags) | 
| virtual QPaintEngine * | paintEngine () const const override | 
| const QPalette & | palette () const const | 
| QWidget * | parentWidget () const const | 
| QPoint | pos () const const | 
| QWidget * | previousInFocusChain () const const | 
| QWIDGETSIZE_MAX QWIDGETSIZE_MAX | |
| void | raise () | 
| QRect | rect () const const | 
| void | releaseKeyboard () | 
| void | releaseMouse () | 
| void | releaseShortcut (int id) | 
| void | removeAction (QAction *action) | 
| void | render (QPaintDevice *target, const QPoint &targetOffset, const QRegion &sourceRegion, RenderFlags renderFlags) | 
| void | render (QPainter *painter, const QPoint &targetOffset, const QRegion &sourceRegion, RenderFlags renderFlags) | 
| void | repaint () | 
| void | repaint (const QRect &rect) | 
| void | repaint (const QRegion &rgn) | 
| void | repaint (int x, int y, int w, int h) | 
| void | resize (const QSize &) | 
| void | resize (int w, int h) | 
| bool | restoreGeometry (const QByteArray &geometry) | 
| QByteArray | saveGeometry () const const | 
| QScreen * | screen () const const | 
| void | scroll (int dx, int dy) | 
| void | scroll (int dx, int dy, const QRect &r) | 
| void | setAcceptDrops (bool on) | 
| void | setAccessibleDescription (const QString &description) | 
| void | setAccessibleName (const QString &name) | 
| void | setAttribute (Qt::WidgetAttribute attribute, bool on) | 
| void | setAutoFillBackground (bool enabled) | 
| void | setBackgroundRole (QPalette::ColorRole role) | 
| void | setBaseSize (const QSize &) | 
| void | setBaseSize (int basew, int baseh) | 
| void | setContentsMargins (const QMargins &margins) | 
| void | setContentsMargins (int left, int top, int right, int bottom) | 
| void | setContextMenuPolicy (Qt::ContextMenuPolicy policy) | 
| void | setCursor (const QCursor &) | 
| void | setDisabled (bool disable) | 
| void | setEditFocus (bool enable) | 
| void | setEnabled (bool) | 
| void | setFixedHeight (int h) | 
| void | setFixedSize (const QSize &s) | 
| void | setFixedSize (int w, int h) | 
| void | setFixedWidth (int w) | 
| void | setFocus () | 
| void | setFocus (Qt::FocusReason reason) | 
| void | setFocusPolicy (Qt::FocusPolicy policy) | 
| void | setFocusProxy (QWidget *w) | 
| void | setFont (const QFont &) | 
| void | setForegroundRole (QPalette::ColorRole role) | 
| void | setGeometry (const QRect &) | 
| void | setGeometry (int x, int y, int w, int h) | 
| void | setGraphicsEffect (QGraphicsEffect *effect) | 
| void | setHidden (bool hidden) | 
| void | setInputMethodHints (Qt::InputMethodHints hints) | 
| void | setLayout (QLayout *layout) | 
| void | setLayoutDirection (Qt::LayoutDirection direction) | 
| void | setLocale (const QLocale &locale) | 
| void | setMask (const QBitmap &bitmap) | 
| void | setMask (const QRegion ®ion) | 
| void | setMaximumHeight (int maxh) | 
| void | setMaximumSize (const QSize &) | 
| void | setMaximumSize (int maxw, int maxh) | 
| void | setMaximumWidth (int maxw) | 
| void | setMinimumHeight (int minh) | 
| void | setMinimumSize (const QSize &) | 
| void | setMinimumSize (int minw, int minh) | 
| void | setMinimumWidth (int minw) | 
| void | setMouseTracking (bool enable) | 
| void | setPalette (const QPalette &) | 
| void | setParent (QWidget *parent) | 
| void | setParent (QWidget *parent, Qt::WindowFlags f) | 
| void | setScreen (QScreen *screen) | 
| void | setShortcutAutoRepeat (int id, bool enable) | 
| void | setShortcutEnabled (int id, bool enable) | 
| void | setSizeIncrement (const QSize &) | 
| void | setSizeIncrement (int w, int h) | 
| void | setSizePolicy (QSizePolicy) | 
| void | setSizePolicy (QSizePolicy::Policy horizontal, QSizePolicy::Policy vertical) | 
| void | setStatusTip (const QString &) | 
| void | setStyle (QStyle *style) | 
| void | setStyleSheet (const QString &styleSheet) | 
| void | setTabletTracking (bool enable) | 
| void | setToolTip (const QString &) | 
| void | setToolTipDuration (int msec) | 
| void | setUpdatesEnabled (bool enable) | 
| void | setupUi (QWidget *widget) | 
| virtual void | setVisible (bool visible) | 
| void | setWhatsThis (const QString &) | 
| void | setWindowFilePath (const QString &filePath) | 
| void | setWindowFlag (Qt::WindowType flag, bool on) | 
| void | setWindowFlags (Qt::WindowFlags type) | 
| void | setWindowIcon (const QIcon &icon) | 
| void | setWindowIconText (const QString &) | 
| void | setWindowModality (Qt::WindowModality windowModality) | 
| void | setWindowModified (bool) | 
| void | setWindowOpacity (qreal level) | 
| void | setWindowRole (const QString &role) | 
| void | setWindowState (Qt::WindowStates windowState) | 
| void | setWindowTitle (const QString &) | 
| void | show () | 
| void | showFullScreen () | 
| void | showMaximized () | 
| void | showMinimized () | 
| void | showNormal () | 
| QSize | size () const const | 
| QSize | sizeIncrement () const const | 
| QSizePolicy | sizePolicy () const const | 
| void | stackUnder (QWidget *w) | 
| QString | statusTip () const const | 
| QStyle * | style () const const | 
| QString | styleSheet () const const | 
| bool | testAttribute (Qt::WidgetAttribute attribute) const const | 
| QString | toolTip () const const | 
| int | toolTipDuration () const const | 
| QWidget * | topLevelWidget () const const | 
| bool | underMouse () const const | 
| void | ungrabGesture (Qt::GestureType gesture) | 
| void | unsetCursor () | 
| void | unsetLayoutDirection () | 
| void | unsetLocale () | 
| void | update () | 
| void | update (const QRect &rect) | 
| void | update (const QRegion &rgn) | 
| void | update (int x, int y, int w, int h) | 
| void | updateGeometry () | 
| bool | updatesEnabled () const const | 
| QRegion | visibleRegion () const const | 
| QString | whatsThis () const const | 
| int | width () const const | 
| QWidget * | window () const const | 
| QString | windowFilePath () const const | 
| Qt::WindowFlags | windowFlags () const const | 
| QWindow * | windowHandle () const const | 
| QIcon | windowIcon () const const | 
| void | windowIconChanged (const QIcon &icon) | 
| QString | windowIconText () const const | 
| void | windowIconTextChanged (const QString &iconText) | 
| Qt::WindowModality | windowModality () const const | 
| qreal | windowOpacity () const const | 
| QString | windowRole () const const | 
| Qt::WindowStates | windowState () const const | 
| QString | windowTitle () const const | 
| void | windowTitleChanged (const QString &title) | 
| Qt::WindowType | windowType () const const | 
| WId | winId () const const | 
| int | x () const const | 
| int | y () const const | 
  Public Member Functions inherited from QObject | |
| QObject (QObject *parent) | |
| QBindable< QString > | bindableObjectName () | 
| bool | blockSignals (bool block) | 
| const QObjectList & | children () const const | 
| QMetaObject::Connection | connect (const QObject *sender, const char *signal, const char *method, Qt::ConnectionType type) const const | 
| void | deleteLater () | 
| void | destroyed (QObject *obj) | 
| bool | disconnect (const char *signal, const QObject *receiver, const char *method) const const | 
| bool | disconnect (const QObject *receiver, const char *method) const const | 
| void | dumpObjectInfo () const const | 
| void | dumpObjectTree () const const | 
| QList< QByteArray > | dynamicPropertyNames () const const | 
| T | findChild (const QString &name, Qt::FindChildOptions options) const const | 
| QList< T > | findChildren (const QRegularExpression &re, Qt::FindChildOptions options) const const | 
| QList< T > | findChildren (const QString &name, Qt::FindChildOptions options) const const | 
| QList< T > | findChildren (Qt::FindChildOptions options) const const | 
| bool | inherits (const char *className) const const | 
| void | installEventFilter (QObject *filterObj) | 
| bool | isQuickItemType () const const | 
| bool | isWidgetType () const const | 
| bool | isWindowType () const const | 
| void | killTimer (int id) | 
| virtual const QMetaObject * | metaObject () const const | 
| void | moveToThread (QThread *targetThread) | 
| QString | objectName () const const | 
| void | objectNameChanged (const QString &objectName) | 
| QObject * | parent () const const | 
| QVariant | property (const char *name) const const | 
| Q_CLASSINFO (Name, Value) | |
| Q_EMIT Q_EMIT | |
| Q_ENUM (...) | |
| Q_ENUM_NS (...) | |
| Q_ENUMS (...) | |
| Q_FLAG (...) | |
| Q_FLAG_NS (...) | |
| Q_FLAGS (...) | |
| Q_GADGET Q_GADGET | |
| Q_GADGET_EXPORT (EXPORT_MACRO) | |
| Q_INTERFACES (...) | |
| Q_INVOKABLE Q_INVOKABLE | |
| Q_MOC_INCLUDE Q_MOC_INCLUDE | |
| Q_NAMESPACE Q_NAMESPACE | |
| Q_NAMESPACE_EXPORT (EXPORT_MACRO) | |
| Q_OBJECT Q_OBJECT | |
| Q_PROPERTY (...) | |
| Q_REVISION Q_REVISION | |
| Q_SET_OBJECT_NAME (Object) | |
| Q_SIGNAL Q_SIGNAL | |
| Q_SIGNALS Q_SIGNALS | |
| Q_SLOT Q_SLOT | |
| Q_SLOTS Q_SLOTS | |
| T | qobject_cast (const QObject *object) | 
| T | qobject_cast (QObject *object) | 
| QT_NO_NARROWING_CONVERSIONS_IN_CONNECT QT_NO_NARROWING_CONVERSIONS_IN_CONNECT | |
| void | removeEventFilter (QObject *obj) | 
| void | setObjectName (const QString &name) | 
| void | setObjectName (QAnyStringView name) | 
| void | setParent (QObject *parent) | 
| bool | setProperty (const char *name, const QVariant &value) | 
| bool | setProperty (const char *name, QVariant &&value) | 
| bool | signalsBlocked () const const | 
| int | startTimer (int interval, Qt::TimerType timerType) | 
| int | startTimer (std::chrono::milliseconds interval, Qt::TimerType timerType) | 
| QThread * | thread () const const | 
  Public Member Functions inherited from QPaintDevice | |
| int | colorCount () const const | 
| int | depth () const const | 
| qreal | devicePixelRatio () const const | 
| qreal | devicePixelRatioF () const const | 
| int | height () const const | 
| int | heightMM () const const | 
| int | logicalDpiX () const const | 
| int | logicalDpiY () const const | 
| bool | paintingActive () const const | 
| int | physicalDpiX () const const | 
| int | physicalDpiY () const const | 
| int | width () const const | 
| int | widthMM () const const | 
Protected Slots | |
| virtual void | modelDataChanged () | 
Protected Member Functions | |
| virtual QRect | drawItem (QPainter *painter, const QModelIndex &index, const QPoint &pos=QPoint()) const | 
| virtual StyleOptionGanttItem | getStyleOption (const QModelIndex &index) const | 
| int | horizontalOffset () const override | 
| bool | isIndexHidden (const QModelIndex &) const override | 
| virtual QSize | measureItem (const QModelIndex &index, bool recursive=true) const | 
| QModelIndex | moveCursor (CursorAction, Qt::KeyboardModifiers) override | 
| void | paintEvent (QPaintEvent *event) override | 
| void | setSelection (const QRect &, QItemSelectionModel::SelectionFlags) override | 
| int | verticalOffset () const override | 
| QRegion | visualRegionForSelection (const QItemSelection &) const override | 
  Protected Member Functions inherited from QAbstractItemView | |
| virtual void | closeEditor (QWidget *editor, QAbstractItemDelegate::EndEditHint hint) | 
| virtual void | commitData (QWidget *editor) | 
| virtual void | currentChanged (const QModelIndex ¤t, const QModelIndex &previous) | 
| virtual void | dataChanged (const QModelIndex &topLeft, const QModelIndex &bottomRight, const QList< int > &roles) | 
| QPoint | dirtyRegionOffset () const const | 
| virtual void | dragEnterEvent (QDragEnterEvent *event) override | 
| virtual void | dragLeaveEvent (QDragLeaveEvent *event) override | 
| virtual void | dragMoveEvent (QDragMoveEvent *event) override | 
| virtual void | dropEvent (QDropEvent *event) override | 
| DropIndicatorPosition | dropIndicatorPosition () const const | 
| virtual bool | edit (const QModelIndex &index, EditTrigger trigger, QEvent *event) | 
| virtual void | editorDestroyed (QObject *editor) | 
| virtual bool | event (QEvent *event) override | 
| virtual bool | eventFilter (QObject *object, QEvent *event) override | 
| void | executeDelayedItemsLayout () | 
| virtual void | focusInEvent (QFocusEvent *event) override | 
| virtual bool | focusNextPrevChild (bool next) override | 
| virtual void | focusOutEvent (QFocusEvent *event) override | 
| virtual void | initViewItemOption (QStyleOptionViewItem *option) const const | 
| virtual void | inputMethodEvent (QInputMethodEvent *event) override | 
| virtual void | keyPressEvent (QKeyEvent *event) override | 
| virtual void | mouseDoubleClickEvent (QMouseEvent *event) override | 
| virtual void | mouseMoveEvent (QMouseEvent *event) override | 
| virtual void | mousePressEvent (QMouseEvent *event) override | 
| virtual void | mouseReleaseEvent (QMouseEvent *event) override | 
| virtual void | resizeEvent (QResizeEvent *event) override | 
| virtual void | rowsAboutToBeRemoved (const QModelIndex &parent, int start, int end) | 
| virtual void | rowsInserted (const QModelIndex &parent, int start, int end) | 
| void | scheduleDelayedItemsLayout () | 
| void | scrollDirtyRegion (int dx, int dy) | 
| virtual QModelIndexList | selectedIndexes () const const | 
| virtual void | selectionChanged (const QItemSelection &selected, const QItemSelection &deselected) | 
| virtual QItemSelectionModel::SelectionFlags | selectionCommand (const QModelIndex &index, const QEvent *event) const const | 
| void | setDirtyRegion (const QRegion ®ion) | 
| void | setState (State state) | 
| virtual void | startDrag (Qt::DropActions supportedActions) | 
| State | state () const const | 
| virtual void | timerEvent (QTimerEvent *event) override | 
| virtual void | updateGeometries () | 
| virtual bool | viewportEvent (QEvent *event) override | 
| virtual QSize | viewportSizeHint () const const override | 
  Protected Member Functions inherited from QAbstractScrollArea | |
| virtual void | contextMenuEvent (QContextMenuEvent *e) override | 
| virtual void | scrollContentsBy (int dx, int dy) | 
| void | setViewportMargins (const QMargins &margins) | 
| void | setViewportMargins (int left, int top, int right, int bottom) | 
| QMargins | viewportMargins () const const | 
| virtual void | wheelEvent (QWheelEvent *e) override | 
  Protected Member Functions inherited from QFrame | |
| virtual void | changeEvent (QEvent *ev) override | 
| virtual void | initStyleOption (QStyleOptionFrame *option) const const | 
  Protected Member Functions inherited from QWidget | |
| virtual void | actionEvent (QActionEvent *event) | 
| virtual void | closeEvent (QCloseEvent *event) | 
| void | create (WId window, bool initializeWindow, bool destroyOldWindow) | 
| void | destroy (bool destroyWindow, bool destroySubWindows) | 
| virtual void | enterEvent (QEnterEvent *event) | 
| bool | focusNextChild () | 
| bool | focusPreviousChild () | 
| virtual void | hideEvent (QHideEvent *event) | 
| virtual void | initPainter (QPainter *painter) const const override | 
| virtual void | keyReleaseEvent (QKeyEvent *event) | 
| virtual void | leaveEvent (QEvent *event) | 
| virtual int | metric (PaintDeviceMetric m) const const override | 
| virtual void | moveEvent (QMoveEvent *event) | 
| virtual bool | nativeEvent (const QByteArray &eventType, void *message, qintptr *result) | 
| virtual void | showEvent (QShowEvent *event) | 
| virtual void | tabletEvent (QTabletEvent *event) | 
| void | updateMicroFocus (Qt::InputMethodQuery query) | 
  Protected Member Functions inherited from QObject | |
| virtual void | childEvent (QChildEvent *event) | 
| virtual void | connectNotify (const QMetaMethod &signal) | 
| virtual void | customEvent (QEvent *event) | 
| virtual void | disconnectNotify (const QMetaMethod &signal) | 
| bool | isSignalConnected (const QMetaMethod &signal) const const | 
| int | receivers (const char *signal) const const | 
| QObject * | sender () const const | 
| int | senderSignalIndex () const const | 
Detailed Description
Legend showing an image and a description for Gantt items.
This is an item view class showing a small Gantt item and it's text defined by LegendRole.
Definition at line 27 of file kganttlegend.h.
Constructor & Destructor Documentation
◆ Legend()
      
  | 
  explicit | 
Constructor. Creates a Legend with parent parent. The QObject parent is not used for anything internally.
Definition at line 22 of file kganttlegend.cpp.
◆ ~Legend()
      
  | 
  override | 
Destructor. Does nothing
Definition at line 31 of file kganttlegend.cpp.
Member Function Documentation
◆ drawItem()
      
  | 
  protectedvirtual | 
Draws the legend item at index and all of it's children recursively at pos onto painter. Reimplement this if you want to draw items in an user defined way.
- Returns
 - the rectangle drawn.
 
Definition at line 112 of file kganttlegend.cpp.
◆ getStyleOption()
      
  | 
  protectedvirtual | 
Creates a StyleOptionGanttItem with all style options filled in except the target rectangles.
Definition at line 101 of file kganttlegend.cpp.
◆ horizontalOffset()
      
  | 
  inlineoverrideprotectedvirtual | 
Implements QAbstractItemView.
Definition at line 69 of file kganttlegend.h.
◆ indexAt()
      
  | 
  overridevirtual | 
Implements QAbstractItemView.
Definition at line 38 of file kganttlegend.cpp.
◆ isIndexHidden()
      
  | 
  inlineoverrideprotectedvirtual | 
Implements QAbstractItemView.
Definition at line 70 of file kganttlegend.h.
◆ measureItem()
      
  | 
  protectedvirtual | 
Calculates the needed space for the legend item at index and, if recursive is true, all child items.
Definition at line 152 of file kganttlegend.cpp.
◆ minimumSizeHint()
      
  | 
  overridevirtual | 
Reimplemented from QAbstractScrollArea.
Definition at line 55 of file kganttlegend.cpp.
◆ modelDataChanged
      
  | 
  protectedvirtualslot | 
Triggers repainting of the legend.
Definition at line 82 of file kganttlegend.cpp.
◆ moveCursor()
      
  | 
  inlineoverrideprotectedvirtual | 
Implements QAbstractItemView.
Definition at line 71 of file kganttlegend.h.
◆ paintEvent()
      
  | 
  overrideprotectedvirtual | 
Reimplemented from QAbstractScrollArea.
Definition at line 88 of file kganttlegend.cpp.
◆ scrollTo()
      
  | 
  inlineoverridevirtual | 
Implements QAbstractItemView.
Definition at line 42 of file kganttlegend.h.
◆ setModel()
      
  | 
  overridevirtual | 
Reimplemented from QAbstractItemView.
Definition at line 60 of file kganttlegend.cpp.
◆ setSelection()
      
  | 
  inlineoverrideprotectedvirtual | 
Implements QAbstractItemView.
Definition at line 72 of file kganttlegend.h.
◆ sizeHint()
      
  | 
  overridevirtual | 
Reimplemented from QAbstractScrollArea.
Definition at line 50 of file kganttlegend.cpp.
◆ verticalOffset()
      
  | 
  inlineoverrideprotectedvirtual | 
Implements QAbstractItemView.
Definition at line 73 of file kganttlegend.h.
◆ visualRect()
      
  | 
  overridevirtual | 
Implements QAbstractItemView.
Definition at line 44 of file kganttlegend.cpp.
◆ visualRegionForSelection()
      
  | 
  inlineoverrideprotectedvirtual | 
Implements QAbstractItemView.
Definition at line 74 of file kganttlegend.h.
The documentation for this class was generated from the following files:
Documentation copyright © 1996-2025 The KDE developers.
Generated on Fri May 2 2025 11:54:20 by doxygen 1.13.2 written by Dimitri van Heesch, © 1997-2006
KDE's Doxygen guidelines are available online.
 Public Member Functions inherited from